From: route@monster.com
Sent: Monday, October 26, 2015 10:56 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DESI P. BACARON Cell: 512.968.5114 – email: desi_bacaron@yahoo.com Woodstock, GA Job Details ·
Perform as Lead Field Engineer
support for assigned Market to start kickoff project specific to wireless
Technology. Support field technician to follow OEM standard
(Commissioning/Integration and Full EF & I) and apply current Method of
procedure. Close coordination with PM Market for NTP (Notice to proceed) and
site scheduling. Perform site Audit and submit closed out package required by
customer. ·
Perform the full commissioning of
OEM Base Station of different technology GSM, CDMA, WCDMA, LTE, – BTS staging
from up to deployment of fully operational network system. ·
Perform Data Collection through
drive test and Bench Marking of different wireless technologies. ·
Technical Consultant/Support for
Technical Field Engineer working on specific wireless technology. ·
Perform the provisional acceptance
test (PAT) with customer (i.e. hardware/software testing, test calls (IS-95B)
and network system coverage) prior to cut over of whole network system. ·
Do the supervision and assist
field engineers for BTS deployment and hardware/software testing. ·
Interpret the site design drawings
and other information in order to correctly place and build the network
element as designed, ensuring compliance with design information,
manufacturer’s specification and that customers site specific requirements
are met. ·
Consultation to field engineers
and customer-on-site performing operation and maintenance and
troubleshooting. ·
Responsible for the set up and
test of network elements in accordance with the specific manufacturer’s
specifications and documentation. ·
Responsible for the final test of
the element and its subsequent connection to the existing network according
to the specific manufacturer’s specifications and documentation. ·
Supervise
technical survey to all proposed location of base station/RF coverage and
make recommendations directly with customer. ·
Do the
supervision for hired contractors for hard labor installation of antenna and
RF cabling, installation of frames, installation of power cabling, drilling,
etc. ·
Perform call
test or SCFT (i.e. echo and noise, correct parameters), call logs and proceed
to site specific troubleshooting. ·
Knowledge in
(TCP/IP) LAN and WAN. Configure, connect and troubleshoot various CISCO
networking devices. Professional
Experience WAVSYS Contractor (Ericsson Project) May 2014 – Present o
Field
Engineer III – Full EF & I, Commissioning and Integration of ATT SIAD
(CISCO MWR-2941-DC) using ACAT– South East Project (Georgia). Lead Tech for
full EF & I, Commissioning and Integration on Ericsson RBS6601 LTE &
UMTS using Ericsson Smart Laptop. Supervision of Level I, II field
technician. Logistics and BOM field delivery services of OEM. Telecommunications Technical Services May 2013 – May 2014 o
(Oct 2013
– Dec 2013) Work directly with ATT deploying Microwave Packet Radio (using
Ericsson Mini-Link and ALU 9500 MPR) – IP Backhaul migration using microwave
technology. Quality installation of SIAD (Smart Integrated Access Device –
CISCO/ALU) and integration using ACAT program. Configuration and
commissioning of Microwave backhaul. Site integration and test performance. o
(Aug
2013 - Oct 2013) LTE Sprint Audit – Equipment and antenna. o
(May 2013
– Aug 2013) Tech Engineer II C & I – T-Mobile Modernization (NSN OEM
ATLANTA) – Quality installation of Antenna, Cables, Grounding/seals, Feeders
and jumper power. Staging of power distribution and alarm cablings for all
technology. Backhaul migration and retrofits. Configuration and commissioning
of different digital units (GSM, UMTS, LTE). Site integration and Call
functionality tests including E911. Modify Antenna
Line configuration ( MHA/RET ) and connectivity as well as Flexi BTS Feature
set ( Rx diversity / Antenna Line sharing ) , Coordinate actions and investigation of technical Issues between
Customer, regional management, tier2/tier3/ Product Line support teams,
Provide support to customers for O&M of RAN Network elements. AVION SYSTEMS INC. (Contractor) Jan 2013 – May 2013: Tech III/Lead
Support – EF & I ATT Ericsson LTE Eastern region. o
Supervision
of Ericsson LTE quality installation. Configuration and commissioning of
digital unit according to latest MOPs and procedures. Call quality
functionality test. AVION SYSTEMS INC. (Contractor) Aug 2012 – December 2012 o
Tech
Support on ATT Ericsson CSRF (Cross Sector Redundancy Feature) validation –
Troubleshoot and perform quality call testing. o
ATT South
East UMTS/LTE – Supervision of quality installation of Radio heads, hybrid
cables, OVPs and digital units. Staging of power distribution and alarm
cablings. Configuration and commissioning of different digital units
(Ericsson UMTS/LTE). Site integration and Call functionality tests including
E911. AVION SYSTEMS INC. Jan 2011 - 12 June 2012: o
Site
Supervisor/Staff Engineer ATT & Verizon LTE Deployment. o
Engineer
support for Ericsson EVDO/LTE – Florida (MPCS) – Installation/Integration of
Ericsson EVDO, LTE. o
Lead
Engineer support for Ericsson LTE – GA, AL Market (Verizon Wireless) o
Accept
delivery of RBS cabinet; Support full EF & I RBS6000; Conduct training to
newly hired ASP making sure all Ericsson standards maintained and followed;
Correct all installation previously installed by other ASP; Manage/submit
required COP in timely manner; Support Ericsson Quality Audit team for
installation work; Coordinate directly/indirectly with NIC SPOC and Ericsson
IM for site troubleshooting; Participate all kick-off meeting with Ericsson
and wireless operator staff; Do equipment inventory; Manage/report AMS tool
in timely manner. o
Lead
Technical Field Engineer Support – Ericsson UMTS Expansion (ATT – Atlanta GA,
Memphis, TN; Louisiana), Ericsson LTE 2nd
Phase (Verizon GA/AL Market) · May 2010 – December 2011 – Senior Technical Engineer –
Ericsson LTE deployment (Verizon, MPCS – ATLANTA); Technical Support for
AT&T UMTS project roll-out (AL, MS, LA & other existing Avion
market). · June 2010 – Lead Technical Support – NSN Nokia LTE Trial
(Installation) – AGRI-VALLEY (AVCI.NET) – Pigeon, Michigan. · April –May 2010 – Lead Technical Engineer – Project
Support – Ericsson LTE (eNode B) installation (MetroPCS) Dallas TX. · Mar 2010 – Technical Engineer – Project Support – Ericsson
Node B (AT&T) Alabama, Mississippi, Louisiana. · Feb. 18, 2010-Technical Engineer –Troubleshoot LAN
connectivity of RNC and Router – T-Mobile RNC Birmingham AL. · Feb. 2009 – August 2009 Technical Consultant – Project
Support – NSN Nokia WCDMA roll-out project (T-Mobile) EF & I US East
Coast & Ericsson Node-B EF & I (AT&T) Texas US. · Sept. 2008 – Jan. 2009 Technical Consultant – Ericsson
project-AT&T TEXAS (Austin, San Antonio) – Node B (RBS3206, 3106) Carrier
Add commissioning/integration/troubleshooting. · June 2008 - Aug. 2008 Technical Consultant – NSN -Nokia
Project-T-Mobile (Atlanta Georgia) - Node B (Flexi-WCDMA BTS) commissioning
& integration/troubleshooting. · Jan. 2008 – May 2008 Drive Tester/Data collection T-Mobile
Knoxville TN, (Nokia Siemens Network) · 2005-2007 Consultant/contract field work – Entire US
ALLTEL Project. Packet Backhaul/3G commissioning (Motorola SC products –
SC4812T, SC4812T-MC, SC4812ET, SC480, UBS) · Nov. 2005 – Jan. 2006 Drive Tester/Data collection
Cingular UMTS Austin TEXAS (Ericsson Network) – TEMS Investigation V6.1. DMN – U.K. Telecoms Engineer (2003 – 2004) · Consultant/contractor to Motorola Thailand Ltd. Oct. 1
2003 – June 2004: Upgrade/expansion of Motorola CDMA BTS products SC4812T,
SC4812MC, SC4812ET, SC300. (West/East region of Thailand – Hutchison). Packet
Backhaul (CISCO MWR1900) and carrier upgrade. System integration and
optimization. Provisional acceptance of CDMA 1X (Voice/Data Call Test). BTS
engineering consultation. INFRACELL NUSATAMA, INDONESIA Telecoms Engineer (2002 – 2003) §
(Contractor) Motorola Thailand
Ltd. Jan. 05, 2002 – March 15, 2003: Telecommunications Engineer –
Commissioning, optimization and integration of CDMA 1X Base Station (SC4812T,
SC300), maintenance of E1 Transmission facilities (DMC, HARRIS), and test
network system performance. Perform site survey and provisional acceptance
test. Supervision of BTS installation (interior/exterior). Consultation to
customer on site. MOTOROLA COMMUNICATIONS PHILIPPINES INC. Systems Engineer (1999 – 2001) · Beijing, China – Motorola Feb. 27 – March 28, 2001: Systems
Integration Engineer – Participated in building Center of Excellence for
Customer Demo and Trial. (SC4812, CDMA – IS95B, HSPD, IWU, CISCO) · Chicago Illinois – Motorola U.S. Nov. – Dec. 2000 – O.J.T.
CBSC upgrade. · Singapore– Motorola Sept. – Oct. 2000– O.J.T.
Optimization/commissioning of SC600 series, and SC4800 series. · Bangladesh – Motorola April – June 2000: Operation and
Maintenance – BTS/RF (i.e. test call, radio optimization HDII, SC2400 CDMA
BTS) · K.L. Malaysia – Telekom Malaysia Jan. 18 – 31, 2000: Project
Support – As built system layout – Site location, BTS equipment SC4800,
proper RF cable route. Ocular survey. (CDMA – IS95A) · Philippines – Motorola Nov. 1999 Joined Motorola’s Teaming
For Excellence (Problem solving process towards customer valued improvements
in the performance of products and services). Cellular
Field Engineer (1997 – 1999) · Bangladesh – Motorola June 14 – 30, 1999: System
Improvement – Checking of Bay Level offset (power requirement/loss of all
system network i.e. noise, one-way audio, IM, etc. – Analog/CDMA HDII,
SC2400. · Venezuela (South America) – Motorola Oct. 27 – Dec. 22,
1998: Project Support – BTS System Integration ANALOG and CDMA – Operation
and Maintenance (SC9600), Installation of mini–BTS laboratory for customer
exhibit CDMA SC9600. · Philippines – Marubeni Account (PILTEL – EO109) 1998-1999:
WLL BTS System Integration and deployment – ANALOG Cell Site (AMPS ThinCell)
– Operation and Maintenance. Customer on-line support. · Philippines – PILTEL – Metro Manila Cellular
Infrastructure Project ANALOG/CDMA Mixed mode SC9600. Equipment Used: · HP8921B, HP473B, Advantest R3465, Agilent 8935, Advantest
R3267/3562, Agilent E4432B/E4406A, Agilent E7495B (El Gato). · SAFCO. Anritsu Site Master. ODM Fiber scope test. · Thin client Laptop Software Application: · AT&T ACAT (AT&T Configuration Assistance Tool) · Motorola Element Manager, ERICSSON AMS, ERICSSON Element
Manager, ERICSSON Smart Laptop, ERICSSON Mini Link Craft (Microwave Packet
Radio), NOKIA BTS Manager. ALU Craft Tool (MPR – Microwave Packet Radio) · TEMS Investigation 6.0, 7.1, FTP software · FTP tools. Training/Certification OSHA
Certified/CPR-AED Certified 2013 AT&T · Ask
Yourself; Supplier Awareness Network Space – ATT online · Best
Practices: Methods of Procedure – ATT online. · Quality
Installation – ATT online ERICSSON
EDUCATION SERVICES · Ericsson ATT
– CBU to DUW modernization. – Ericsson New, Jersey (Feb 19-20, 2014) · Ericsson
T-Mobile Multi Standard Solution Overview – Richardson, Texas (July 27, 2012) · Ericsson
Mini Link IN ANSI – Richardson, Texas (May 10, 2012) · Qualified
ERICSSON CDMA Commission/Integration – Richardson, Texas (April 19,
2012) · Certified
ERICSSON 3G and LTE RBS · LTE RBS
6000 Installation and Integration for ASPs – Plano, Texas (Dec 11, 2009) · Installation
of Node B Ericsson RBS32106, RBS3206, RBS3418, RBS3518 · Node B
(RBS3206,RBS3106, RBS3418, RBS3518) Integration and Commissioning – Plano,
Texas (August 19-22, 2008) NOKIA
SIEMENS NETWORKS PTID: 001ADRW0003662 · Certified
NSN 3G Level I,II,III · Installation
of Nokia Multi system Flexi BTS · FLX005
Flexi Boot Camp: Flexi WCDMA Installation, Commissioning, & Integration –
North America, Conyers GA (Mar 17-21, 2008) · Flexi
Multi Radio BTS (2G&3G) Commissioning & Integration – Irving SEC (May
20, 2013) MOTOROLA
LTD. BANGKOK THAILAND · Certified
MOTOROLA 3G BTS · SC4812T,
SC4812T-MC, SC4812ET/SC300 BTS 1X OPTIMIZATION – MOTOROLA TED (Jan. 24-25,
2002) · HARRIS –
MDL 2000 MICROWAVE SYSTEMS Installation/Commissioning (Oct. 2002) MOTOROLA UNIVERSITY TECHNICAL EDUCATION,
MUNDELEIN IL. USA § SAO010 (CDMA-CBSC) – Oct. 31-Nov. 10, 2000 § SAO200 (CDMA-CBSC) – Oct. 5-6 2000 § SC9600 Base Transceiver Station (CDMA)– Oct. 13-17,
1997 § SC9600 Base Transceiver Station for Stand-Alone Analog
Systems – Oct. 6-10, 1997 § HDII Cell Site Analog BTS – Oct. 20-28, 1997 § ThinCell Cell Site Hardware/Optimization – Sept.
22-30, 1997 § Analog Cellular Systems Overview – Sept. 15-19, 1997 MOTOROLA TECHNICAL EDUCATION CENTER,
SINGAPORE § BSSC Applications (BSS08) GSM – July 12-13, 1999 § BTS Products Operations & Maintenance (MC01) GSM –
July 14-23, 1999 LOCAL TRAINING, PHILIPPINES § Internetworking with Microsoft TCP/IP on Windows NT
4.0 (MISNet Philippines) – Aug. 21-25, 2000 § Interconnecting CISCO Router Configuration (ICND)
(Training Partners Phils.) – July 10-14, 2000 § Advanced CISCO Router Configuration (ACRC) – (Training
Partners Phils.) – July 17-21, 2000 § UNIX –OS (I/ACT Phils.) – Feb. 14-17, 2000 § MOTOROLA Super Cell Products CDMA (MOTOROLA)– Jan. 2000 § Integrated Dispatch Enhanced Network (iDEN) System
School – May 24, 1999 § RF SMAP – (MOTOROLA) March 31, 1999 § RF Netplan CDMA (MOTOROLA) – March 29-30, 1999 § RF Compass (MOTOROLA) – March 26, 1999 § RF Netplan (MOTOROLA) 3.1 – March 22-25, 1999 § Overview: EMX 2500 (MOTOROLA) – Jan. 20-22, 1997 EDUCATION:
Certified CISCO Network Associate – CISCO ID# CSCO CSCO10254876
(expired on April 11, 2004) 1991–1995 Mapúa Institute of Technology
B.S. Electronics and
Communications Engineer (PRC License No. 13008) References: Upon request |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|